Book Erratum
Understanding The Analytic Hierarchy Process
Abstract
Errors found after publishing Understanding The Analytic Hierarchy Process [1]
Page 40, line 3 from the top
is
should be
Page 75, the numerical example is faulty. The correct version is:
and the constant term vector
is given as
Solving
leads to the following logarithmized ranking vector
Hence, the (unscaled) ranking vector is
The last step to receive the ranking in the usual form is scaling so that the entries of the ranking vector sum up to
. The final form of the ranking vector is as follows:
According to the computed ranking, the most preferred alternative is
with the ranking value
. The second place is taken by
with
, then
and
.
Of course, one may verify that GMM applied to the following matrix
results in
.
Page 80, line 1 from the top
is
where
is the number of existing comparisons in the i-th row of
,
should be
where
is the number of existing comparisons in the i-th row of
except the diagonal
Page 81, line 12 from the bottom
is
should be
Page 113, line 14 from the bottom
is
6.3.8.1 Effectiveness of the Koczkodaj index
should be
6.3.8.1 Effectiveness and the Koczkodaj index
Page 96, line 2 from the top
is
Let
be a priority function assigning priorities to alternatives and
be an
PC matrix.
should be
Let
be a priority function assigning priorities to alternatives where
be an
PC matrix and the relative priority of the two alternatives corresponds to their direct comparison.
Page 123, line 5 from the top
is
should be
Page 150, line 11 from the bottom
is
should be
Page 150, line 7 from the bottom
is
should be
References
1, Understanding the Analytic Hierarchy Process (6000 Broken Sound Parkway, Boca Raton, FL, 33487, USA: Chapman and Hall / CRC Press, 2020).
Erratum can also be downloaded as the PDF file here